Cocina para hoteles y restaurantes

Blast Chiller Sizing: Calculate Batch Capacity and Timing

To choose the right size blast chiller for a restaurant or catering kitchen, record the weight and pan arrangement of the largest batch, then check when the next batch needs a cooling position. Ask the supplier to verify kilograms per cycle with your product, loading pattern and required cooling conditions.

This guide turns those inputs into a purchasing brief. The worked example follows three 30 kg batches and shows how cabinet occupancy, pan availability and transfer into cold storage affect the equipment plan.

Define the batch the cabinet must actually process

For each product, record its cooked mass, container dimensions, fill depth, starting core temperature, required final core temperature and the applicable cooling time. Use the limits and checks established for your operation. The supplier’s performance evidence should cover the intended product and loading conditions.

InputRecord for your productionAsk the supplier to confirm
Batch massCooked product entering together, in kgUsable kg per cycle for that product and process
Pan loadingPan format, fill depth, kg per pan and number of pansUsable runner positions, spacing and airflow with the proposed load
Cooling conditionsStarting and final product core temperatures and the required timeComparable test conditions and probe records
Arrival timesWhen each cooked batch is ready for its cooling stepWhich cabinet will accept each batch
Complete occupancyCooling plus loading, unloading, transfer, cleaning and reset timeWhen the cabinet is available for the next batch
Site and next stageAmbient conditions, services, access and onward storageInstallation requirements and performance at the site conditions

Calculate batch mass = number of loaded pans × product mass per pan. For example, 12 pans at 2.5 kg of product per pan give a 30 kg batch. Confirm both the 30 kg process load and the 12 usable positions. The pan dimensions and required airflow must fit together.

Compare chilling and freezing performance separately when a cabinet offers both modes. The blast chiller and blast freezer comparison explains the different purchasing purposes.

Build the production-release timetable

Independent planning example. The figures below are assumptions for capacity arithmetic. Replace them with a product trial and the approved operating process. The example assumes each cabinet accepts a complete 30 kg batch in 12 pans. Its occupied slot is 90 minutes, made up of an 80-minute cooling allowance and 10 minutes in total for loading, unloading, transfer and reset. These durations must be verified for the actual food, cabinet and site.

The initial cabinet preparation is complete before the first batch arrives. Each stated arrival is when the batch is ready for its loading slot, with any earlier portioning and transport already accounted for.

BatchReady for coolingProduct massLoaded pansOccupied slot
A12:0030 kg1290 minutes
B12:4530 kg1290 minutes
C13:3030 kg1290 minutes

The production run releases 90 kg in three batches. A cabinet processing 30 kg in each 90-minute occupied slot has a nominal repeating rate of 30 × 60 / 90 = 20 kg per hour under these assumptions. Check the individual arrivals as well as this rate.

Check whether each arriving batch has an available cabinet

With one cabinet, batch A occupies the first slot from 12:00 to 13:30. Batch B arrives at 12:45, while that slot is still occupied. Its earliest cabinet slot starts 45 minutes after arrival. The following table compares this conflict with a two-cabinet allocation.

On a phone, swipe across the table to see the complete allocation.

BatchArrivalOne cabinet: earliest startUnresolved waitTwo cabinets: allocationOccupied intervalCabinet next available
A12:0012:000 minutesCabinet 112:00–13:3013:30
B12:4513:3045 minutesCabinet 212:45–14:1514:15
C13:3015:0090 minutesCabinet 113:30–15:0015:00

The waiting figures identify conflicts that need resolving before operation. Confirm a revised cooking-release schedule, additional tested cooling capacity or another process approved for the food. The capacity arithmetic provides no allowable food-waiting time.

In the two-cabinet arrangement, each batch starts its loading slot when it arrives. Cabinet 1 is released at 13:30 and accepts batch C at that time because the complete turnaround is already included. Check staff availability and the transfer route at each handoff.

For equal batches that each fit one identical cabinet and arrive at a fixed interval, a useful first calculation is cabinets required = round up(complete occupied minutes / arrival interval in minutes). Here, round up(90 / 45) = two. Verify the result against the full timetable, including other products using the same equipment.

Check pans and onward storage as part of the same plan

Two cabinets in this example provide 24 occupied pan positions at the busiest overlap. The three batches use 3 × 12 = 36 pans in total. If the food stays in its original pans after chilling, and those pans are unavailable for washing and reuse before the next batch is prepared, the production plan needs all 36 pans ready for the run.

Reserve space in the receiving cold storage for each completed load. If all three batches remain in their original pans and none has been dispatched, that stage must accommodate 36 loaded pans. Check the actual pan dimensions, rack pitch, airflow and existing stock in the proposed storage equipment.

Measure the route from cooking and portioning to the chiller, then to storage. Allow for door openings, trolley turning, unloading and access for cleaning. Ask the supplier for the installation and service clearances for the exact model.

Where food cools inside a kettle or through a fluid-fed heat exchanger, prepare a separate fluid-loop duty calculation. The blast chiller and process chiller guide helps identify which cooling route your equipment uses.

Test the assumptions before choosing the final capacity

  • A longer occupied slot. If the verified slot becomes 110 minutes while batches still arrive every 45 minutes, round up(110 / 45) = three cabinets for the same equal-batch, immediate-start arrangement. At 13:30, the first two cabinets would still be occupied.
  • A larger batch. If a batch grows beyond the tested 30 kg load, obtain performance evidence at the new mass and pan arrangement. Rebuild the allocation if the batch needs more than one cabinet.
  • A different product or fill depth. Repeat the test for the intended load and record the core-temperature result. Container geometry and airflow affect the process.
  • Shared chilling and freezing work. Put both types of cycle on the same cabinet timetable. Include the required reset and cleaning between them.
  • Extra transfer or cleaning time. Extend the occupied intervals and check every following arrival. A cabinet becomes available after the complete planned handoff.

Use representative loads and record the slowest relevant product locations identified in your trial plan. Agree the test method, required result and evidence with the supplier and the person responsible for your operation’s food-safety process.

Copy this capacity-check table into the supplier brief

Complete the first column of information from your production records and ask each supplier to fill the response. Keep the tested model and configuration identifiable when comparing proposals.

CheckYour requirementSupplier response and evidence
Product and batchEnter product, cooked kg and arrival time for each batchEnter tested product and maximum verified load
Loading formatEnter pan dimensions, fill depth, mass per pan and countAttach the usable loading arrangement and runner spacing
Cooling resultEnter required start and final core temperatures and timeProvide the corresponding load test and probe record
Complete slotEnter cooling, handling, cleaning and reset allowancesConfirm occupied time and next-load readiness
Batch allocationEnter all products and the full arrival timetableIdentify the cabinet and slot for every batch
Onward transferEnter receiving storage space and the transfer routeConfirm trolley, pan and handling compatibility
Site fitEnter site ambient conditions, services and measured accessProvide model-specific installation and service requirements
AcceptanceEnter the agreed product-trial conditions and required recordsConfirm the evidence supplied with the proposed configuration

Discuss your cooling-capacity brief with GRACE

Send GRACE the completed table, product list, batch timetable, pan details, measured layout and available utilities. Include the cooling conditions your operating process requires. These inputs let the equipment discussion address the load and arrival pattern your kitchen needs to handle. Contact GRACE about your blast chilling equipment requirements.