The Ritz-Carlton Orlando, Grande Lakes: entrance fountain and hotel façade.
The Ritz-Carlton Orlando, Grande Lakes: entrance fountain and hotel façade.
USA flagUSA
LUXURY RESORT & BANQUET KITCHEN · ORLANDO, FLORIDA

The Ritz-Carlton Orlando, Grande Lakes Kitchen Project

Connect restaurant precision with banquet-scale production.

A large resort kitchen has to support several service rhythms at once. GRACE’s planning approach connects fresh preparation, restaurant finishing, banquet dispatch and washing through a coordinated equipment and utility package.

Orlando · Florida, USA582 guest roomsRestaurant & banquet service
01 / THE RESORT & DINING

A luxury resort with distinct dining demands

The Ritz-Carlton Orlando, Grande Lakes is a 582-guestroom resort in Orlando, Florida. Its dining offer includes the steak and seafood restaurant Knife & Spoon, Southern-inspired Highball & Harvest, lounge and poolside service, and in-room dining. Highball & Harvest highlights produce from Whisper Creek Farm.

Events add a different production rhythm. The hotel’s official venue table lists 1,060 guests in banquet configuration for The Ritz-Carlton Ballroom. That describes the room arrangement; kitchen sizing still starts with the event menu, service window, restaurant demand and staffing plan.

Official dining overviewOfficial room-count factsheetOfficial banquet capacity table

Knife & Spoon dining room with its sculptural ceiling.
Knife & Spoon dining room with its sculptural ceiling.
Highball & Harvest dining tables beside the windows.
Highball & Harvest dining tables beside the windows.
02 / PREPARATION TO SERVICE

Give each service its own finishing and dispatch space

For this type of resort, shared preparation can feed several outlets. The critical decisions are where ingredients separate, where dishes finish and how food reaches the service team.

Fresh ingredients to restaurant finishing

Separate raw meat, seafood and produce preparation, then position ready-to-cook ingredients close to the relevant line. Keep a clear finishing pass for individual orders and a separate collection point for room-service trays.

Banquet batches to timed dispatch

Plan oven tray loads, production cycles, plating benches and heated-cart staging around each event wave. Allow loaded carts to turn and queue without obstructing cooks. Menu trials and usable tray loads establish the equipment quantity.

Returned plates to clean storage

Give returned crockery a direct route through sorting, pre-rinsing and washing. Size inlet and outlet benches, rack storage and clean-plate staging together so a busy event does not block the restaurant pass.

Highball & Harvest: bar counter and adjoining dining area.
Highball & Harvest: bar counter and adjoining dining area.
Highball & Harvest: dining tables and banquette seating.
Highball & Harvest: dining tables and banquette seating.
03 / KITCHEN DESIGN

Coordinate the entire working zone, beyond machine footprints

GRACE’s commercial kitchen planning links equipment numbers to preparation zones, aisles, cart routes and service points. Custom stainless-steel fabrication fits landing benches, sinks and shelves to the working sequence. These library views show arrangements for batch cooking and adjacent preparation.

GRACE 3D design reference: cooking line with adjacent preparation and working aisles.
GRACE 3D design reference: cooking line with adjacent preparation and working aisles.
GRACE 3D design reference: a combi oven, preparation counters and coordinated work positions.
GRACE 3D design reference: a combi oven, preparation counters and coordinated work positions.
05 / FLORIDA PROJECT COORDINATION

Specify for a warm, humid Florida kitchen

For an Orlando project, refrigeration recovery, site utilities and exact-model documentation deserve attention before procurement.

Cold holding under working load

Florida plan-review guidance specifies 41°F / 5°C or below for refrigerated food requiring temperature control. Check loaded recovery at the specified kitchen ambient, door-opening patterns and ventilation clearances.

Condensation and accessible maintenance

Coordinate insulation, door seals and condensate drainage with the kitchen environment. Keep condenser faces, filters and service panels accessible; position the cold preparation area away from avoidable hot-line heat.

A coordinated 60 Hz equipment schedule

Confirm actual site voltage, phase, available capacity and 60 Hz appliance availability model by model. Record connection loads, isolators and water/drain points for coordination with the US electrical and plumbing team.

Documents attached to the selected model

Resolve required electrical-safety and sanitation listings with the local project team. Match each document to the exact appliance model and configuration before ordering, alongside water-treatment and maintenance requirements.

Florida food-service plan reviewOSHA electrical-safety certification programmeNSF sanitation certification

07 / PROJECT DELIVERABLES

Make the kitchen package usable by the buyer and site team

A coordinated design and procurement set

Numbered layouts, equipment dimensions and custom fabrication drawings connect each purchase to a work position. Utility schedules and installation clearances give consultants and trades a common reference.

A service plan behind the equipment count

Review menus, peak event waves, restaurant demand, tray loads and cart movements together. Define operating assumptions and trial requirements before the buyer commits to the final equipment mix.

Delivery and service preparation

Provide packing dimensions, installation sequence information, operating manuals and model-specific spare-parts lists. Identify service access and commissioning responsibilities with the local team.

GRACE’s engineering and manufacturing capabilities bring together cooking equipment, refrigeration and custom stainless fabrication for hospitality projects. The Hotel Capri Sitges case in Spain provides a further reference with kitchen layouts, equipment photography and bar support.