Snow Lodge’s illuminated chalet facade in Courchevel 1850, France.
Snow Lodge’s illuminated chalet facade in Courchevel 1850, France.
France flagFrance
SKI HOTEL · COURCHEVEL 1850

Snow Lodge Hotel Kitchen Project in Courchevel 1850, France

Breakfast before the slopes. Flexible cooking for the rest of the day.

A boutique ski hotel needs a kitchen that moves smoothly between buffet replenishment, room-service orders and chef-led meals. GRACE brings these tasks into one equipment and workstation plan, with winter start-up and mountain delivery considered from the outset.

20 luxury suites and apartmentsFacing the Bellecôte slope, Courchevel 1850Breakfast buffet, room service and table d’hôte
01 / THE HOTEL

A chalet hotel with several ways to dine

Snow Lodge is a boutique hotel in Courchevel 1850, France, facing the Bellecôte slope in the Three Valleys ski area. Its official website lists 20 luxury suites and apartments. The timber chalet setting and winter leisure focus give this project a different operating brief from a large urban hotel.

The hotel offers buffet breakfast, breakfast in the room on request and takeaway breakfast on departure day. Its chef also prepares room service and a table d’hôte for lunch or dinner. The kitchen therefore needs a clear handover for each service, alongside flexible preparation and cooking positions.

Official hotel introductionSuites and apartmentsOfficial dining services

The Snow Lodge chalet framed by snow-covered trees and mountain slopes.
The Snow Lodge chalet framed by snow-covered trees and mountain slopes.
Snow Lodge’s timber roofline with Alpine peaks beyond, from the hotel’s official gallery.
Snow Lodge’s timber roofline with Alpine peaks beyond, from the hotel’s official gallery.
02 / SERVICE & WORKFLOW

One kitchen, three distinct service moments

For this service profile, GRACE can organise the layout around three practical priorities.

Keep breakfast replenishment moving

Stage ingredients and GN pans before service. Use smaller cooking batches and a dedicated refill landing point, so staff can replenish the buffet without occupying the room-service assembly bench.

Give room service its own handover

Reserve a clean bench for order checks, covered trays and takeaway breakfast packing. Place crockery and packaging within reach, with used trays returning through the washing side rather than the dispatch position.

Reset for lunch and dinner

Arrange preparation and finishing stations around the agreed table d’hôte menu. Coordinate oven batches, induction cooking and plate landing space, so scheduled meals and individual room orders can share the cooking area.

03 / KITCHEN PLANNING

Put preparation, finishing and dispatch within easy reach

GRACE’s commercial kitchen planning connects ingredient storage, preparation, cooking and service handovers. Through custom stainless steel fabrication, benches, sinks and shelving can be sized around door openings, working aisles and equipment access. The GRACE 3D designs below show a cooking island with adjacent plate landing space, and a preparation station with accessible crockery storage.

GRACE 3D kitchen design: a cooking island with preparation and plate landing surfaces.
GRACE 3D kitchen design: a cooking island with preparation and plate landing surfaces.
GRACE 3D kitchen design: preparation worktops, sink and crockery storage.
GRACE 3D kitchen design: preparation worktops, sink and crockery storage.
05 / SITE EQUIPMENT DETAILS

Prepare the equipment for France and the winter season

Site coordination should resolve connections, commissioning and delivery access before equipment reaches the hotel.

Match the French installation

Confirm the site’s 50 Hz supply, actual voltage, phase and available load against each appliance’s operating range. Agree model-specific EU conformity documents and French operating information. Include the actual site altitude in the oven manufacturer’s commissioning brief.

Complete a season-opening trial

Test cooking and washing cycles, drainage and water-treatment settings before winter service. Keep filters and service panels accessible, and prepare a routine-parts list. Agree cleaning, draining and storage procedures for equipment taken out of use, following its instructions.

Plan delivery through to the kitchen

Check the unloading point, delivery time slot, doors, lifts and turning space with the hotel team. Compare access dimensions with the oven’s packed and unpacked dimensions, and settle any assembly sequence before dispatch.

French electricity network referenceEU product conformity guidance

07 / PROJECT DELIVERABLES

What GRACE delivers to the project team

A service-based equipment brief

A layout and model schedule linked to breakfast demand, room orders, menus and staffing, with defined positions for buffet refill, tray dispatch and dish return.

Installation and fabrication details

Equipment footprints, service clearances, electrical and water connections, and custom stainless drawings for coordination with the site installer.

A winter handover checklist

Model-specific operating and maintenance information, commissioning checks and routine-parts references for the operator and its local service team.

For another seasonal accommodation setting, explore Natura Resort kitchen planning in Poland.