Sourcing & Buying Guide

Does This Restaurant Space Have Enough Electrical Power? A Pre-Lease Checklist

When a listing says “restaurant-ready” or “three-phase available,” ask what electrical supply serves the exact unit. An existing restaurant may have cooked on gas. Your electric oven, induction range and dishwasher could need a different supply, even if the equipment fits the room.

Before you sign or place an equipment order, confirm the supply to your unit, list the loads that will stay, and ask a qualified electrician to check the proposed kitchen against both. Ask the equipment supplier for the electrical data for each exact model and option.

Turn listing details into questions for the landlord

What to ask before booking a site survey
Listing or viewing clueQuestion to askWhat to request
“Three-phase available”Does that supply serve this unit’s panel, or is it available elsewhere in the building?A service record or one-line drawing showing the supply to the unit, with voltage and phase identified.
“Previously a restaurant”Which major appliances used electricity, and what building equipment will still run from this supply?The former equipment list, plus details for retained refrigeration, ventilation, air conditioning and hot water.
“New panel” or spare breaker spacesWhat supply rating and usable capacity can be verified for the unit?The available panel and service documentation. Ask your electrician to interpret the ratings and remaining capacity.
“Power upgrade possible”Who can authorize an upgrade, and which parts would be inside the property or on the utility network?Written confirmation of the proposed scope and the contact route for a utility capacity review.

What to confirm at the site survey

Ask your electrician to identify the incoming service, the supply allocated to the tenant and the circuits serving the planned equipment locations. Confirm voltage, frequency and phase. Check which loads are shared and which will remain on your supply. If recent measured peak data is available, ask what equipment was operating when it was recorded. A bill that shows energy in kWh is useful background. Comparing a proposed installation needs the verified supply and a review of expected demand.

  1. Property Confirm the supply and equipment that serve this unit.
  2. Equipment Record model, voltage, frequency, phase and nameplate input for each quoted configuration.
  3. Decision Ask the electrician to confirm compatibility, review demand and identify any work needed.
Three checks before committing to the premises or releasing the equipment order.

Ask for the manufacturer’s data sheet for any alternative model, even if it has the same tray capacity or cabinet size. The installation manual linked below shows how electrical data can differ by voltage and model variant.

Worked example: an electric cooking line in a former gas kitchen

Suppose the loads that will remain on the unit’s supply total 6 kW of connected input. Your proposed oven is 11 kW, the induction range 8 kW and the dishwasher 6 kW. The new equipment adds 25 kW on the inventory. Including the retained load gives 31 kW of connected input. The figures are illustrative. Each listed input is assumed to include its associated heaters and accessories.

Now suppose the oven on the quote is configured for 400 V three-phase, while the confirmed tenant supply is 208 V three-phase. Resolve the voltage match with the manufacturer and your electrical designer. A supplier can look for a supported 208 V configuration and provide its own input and connection data. Your designer can then evaluate simultaneous operation and supply capacity using the verified equipment list. Keep the load list in kW and the service values in their stated units for that review.

What to do with the survey result

  • The supply and proposed equipment match. Keep the accepted model list and the electrician’s review together. Use those documents when finalizing the order.
  • A compatible configuration is available. Compare its capacity, recovery time and electrical data with the original selection. Ask your electrician to review the revised list.
  • Additional supply is needed or the available capacity is unverified. Ask the landlord and electrical contractor to identify the next step with the local network operator or utility. Document the work needed before releasing equipment that depends on it.

For the next stage, use the restaurant kitchen setup checklist to coordinate the equipment schedule with delivery access, water services and the layout.

Compare equipment configurations with GRACE

Share the verified supply details, menu, peak production and proposed equipment list. GRACE can help compare model configurations and coordinate equipment positions with the kitchen plan. Talk to GRACE about planning your kitchen.